Real teams. Real results.
How engineering teams use Pinpole's pre-deployment simulation to find critical failures, validate architectural choices, and avoid costly mistakes — before a single resource is provisioned.
Product launch at 50× traffic: how pre-deployment simulation prevented a public outage
A Series B engineering team was preparing for a high-stakes product launch with a projected 50× traffic increase. Two critical architectural failures were hiding in their design.
Pre-deployment serverless cost estimation: hitting within 4% of the first real AWS bill
A growth-stage fintech needed to project their AWS spend before committing to a serverless architecture. Simulation predicted monthly bill to within 4%.
DynamoDB vs Aurora: simulation-led database selection that avoided a $68K/month mistake
Pre-deployment modelling revealed the $68K/month cost gap — and the performance divergence at their exact traffic profile — before a single resource was provisioned.
DynamoDB vs RDS: simulation-based cost and performance across 10K, 100K, and 1M RPS
A side-by-side simulation of DynamoDB on-demand, DynamoDB provisioned, Aurora Serverless v2, and RDS PostgreSQL across three traffic tiers.
Run your own pre-deployment simulation
Design your architecture on the visual canvas, simulate your traffic profile, and get cost and performance data before you provision. Free tier — no credit card required.